Get Quick Quote From Supplier
Can u send us your latest product catalog with complete quote prices.Manufacturing and supplying at the site of work spirally submerged arch welded M.S. pipes including procurement of plates, gas cutting to required size, rolling , tack welding on automatic machine and forming V edge on both ends of pipes, including hydraulic pressure test conforming to IS:3589-2001 grade Fe410 in double random length of 10 to 12.2 meters in beveled ends including freight, loading and unloading by mechanical crane and staking at site including all taxes etc. complete, conveying carefully from stack at site, 250m from both sides rolling and lowering in trenches, laying and jointing true to line and level and perfect linking of joints, including tack welding for mild steel pipes for water supply pipeline complete in all respects as per the direction of the Engineer in charge and welding in all position with minimum 3 nos. of runs for M.S. pipes and specials and flanges, internally and externally including gauging wherever necessary, fixing appurtances and other accessories, cost of water pumping arrangement and hydraulic testing etc. complete.Size in (OD) in MM for 10mm thickness. k) 1422 MM.